NC-2009 SSc6.2:Stormwater Design—Quality Control

Accounting for Forested Areas

I have a project with a LEED site boundary that includes some undisturbed naturally forested area. How do I account for this area in stormwater quality calculations?

0

You rely on LEEDuser. Can we rely on you?

LEEDuser is supported by our premium members, not by advertisers.

Go premium for $15.95  »

Sun, 10/07/2012 - 14:10

Does it route through a BMP?

Tue, 10/16/2012 - 19:11

No. It accounts for more than 50% of the LEED project site and naturally infiltrates water because it is undisturbed.

Tue, 10/16/2012 - 19:25

Tough to say without seeing this first hand, but, this credit leaves a lot up to the discretion of your CE, with the catch all that the approach should be acceptable within the locality. If I were working on this project, I would totally net out the undisturbed areas, and route only the disturbed area through the a BMP with 80% TSS removal.