I am trying to verify that the cisterns on site release stormwater quickly enough to capture 2-year 24-hour design storm events by calculating the minimum drawdown rate. However, I cannot figure out what the rainfall event interval is. Is this information that I should be able to find or something that needs to be calculated?
You rely on LEEDuser. Can we rely on you?
LEEDuser is supported by our premium members, not by advertisers.
Add new comment
To post a comment, you need to register for a LEEDuser Basic membership (free) or login to your existing profile.