Once the outside air has been read and the assumed potential critical zones have been identified, if a building owner/staff is unable to compile the mechancial as-builts in order to determine max (Vdzd) and min (used to determine Ds), is it acceptable to trend those spaces through the building DDC system for a certain period of time in order to determine those values? Any further advice? Thanks in advance.