LEED NC 2009 says in p.170 "In buildings with multiple shifts, use the number of FTEs from all shifts". We have a 24hs building, with 4 shifts, some of them overlap. I'm not 100% cleared of what LEED means by "use" in the sentence. Does this mean that I have to sum up the FTEs from the 4 shifts?? Or only of the peak building use, as in credit SSc4.2?