Option 2 on campus - do we need to add a meter for irrigation?

We will be tieing the new irrigation system into the existing. Do we need to meter the water use with the LEED boundary? Or will a buidling water meter that meters the water use within the building suffice for the MPR 6 requirement?

1

You rely on LEEDuser. Can we rely on you?

LEEDuser is supported by our premium members, not by advertisers.

Go premium for $15.95  »

Thu, 05/31/2012 - 19:48

I don't think there is a clear ruling on this. In general you need to include the whole building's / project's water consumption. So I would think, if you claim points related to irrigation than definitely install the meter. If you don't that don't.

Thu, 06/06/2013 - 19:44

LEED EB defines "whole building" as the building and associated grounds for water performance measurement. In addition,The Energy and Water Data Release Authorization form which can be used with MPR 6 requires including the water use of the associated grounds as well. I would install a meter for the irrigation.