Site is located in western Wasington state. We are using the western Washignton Hyraulic model #3 to size the underground detention. The infiltration rate for the site is 50"/hour. Using the LEED volume calculation, which requires 90% of the average annual rainfall to be captured, requiring the underground detention to double in size. Becasue of the high infiltarion rate is it possible to use an alternative compliance method to show the LEED volume calculation is onerous as the water will infiltrate, and the size isn't necessary.
You rely on LEEDuser. Can we rely on you?
LEEDuser is supported by our premium members, not by advertisers.
Add new comment
To post a comment, you need to register for a LEEDuser Basic membership (free) or login to your existing profile.