Based on review of CIRs and the comments on this forum I think our approach to this prerequisite would be acceptable, but I thought I'd see if anyone else out there wanted to weigh in. The project is a multi-story adaptive reuse apartment project with a very long footprint composed of a 6-story tower with two-story wings on either side. We plan to provide a centrally located recycling dumpster outside the building behind the tower (in the vicinity of one of the general waste dumpsters), with adjacent access from the building for all occupants. A collection bin would be provided for each apartment unit for collection of comingled recyclables, and the residents would take their bin when full to the central exterior dumpster, which would be picked up on a weekly basis. Does this approach meet the intent of the prerequsite? Any input is appreciated; thanks!
You rely on LEEDuser. Can we rely on you?
LEEDuser is supported by our premium members, not by advertisers.
Add new comment
To post a comment, you need to register for a LEEDuser Basic membership (free) or login to your existing profile.