FAQs about EAp2 :

The project is built on a site with existing exterior lighting installed. How should this be accounted for?

Can mezzanines open to floors below be excluded from the energy model?

How do I provide a zip code for an international location?

For a project outside the U.S., how do I determine the climate zone?

For a project outside the U.S., how do I determine the Target Finder score?

Do hotel rooms need automatic light shut-off control?

How commonly are the 90.1 mandatory compliance forms submitted as part of EAp2/EAc1?

The Section 9 space-by-space method does not include residential space types. What should I use?

Can the Passive House Planning Package (PHPP) be used to energy model for LEED?

Is it acceptable to model a split-type AC with inverter technology compressor as a heat pump, like modeling VRF?

Can the Trace 700 'LEED Energy Performance Summary Report' by uploaded to LEED Online in lieu of the Section 1.4 tables spreadsheet?

A portion of our building envelope is historic. Can we exclude it from our model?

Which baseline HVAC system do I use if my building has no heating or air conditioning?

For an existing building, do I need to rotate the model?

Our project has a diesel backup generator. Should we include it in our energy model?

Our project has a large process load—75%. Despite our efforts to make an efficient HVAC design, the cost savings are minimal. What can we do to earn this prerequisite and be eligible for LEED certification? Is there any flexibility in how we model the p

Can SHGC be higher in the proposed than in the baseline model?

Our process load is higher than 25%. Do we have to justify that?

Do I need to justify the electrical and fuel rates I am using in my model?

Our local code references ASHRAE 90.1-2010. Should I use that for my documentation, or 90.1-2007?

View answers »

Forum discussion

CS-2009 EAp2:Minimum Energy Performance

Exhaust air energy recovery in the baseline

Hello all, my question is: when do i have to consider the exhaust air energy recovery in the baseline building’s AHU? The 90.1 User’s manual reports that exhaust air Energy recovery is required for fan system that are larger than 5000 cfm and which also require a significant amount of outdoor air (70% or more); but what does this 70% refers to? To the proposed building or to the baseline building? And in the last case, how can I value this 70%? In the summer design day, winter design day or other? Thank you very much. Have a good day!

2

You rely on LEEDuser. Can we rely on you?

LEEDuser is supported by our premium members, not by advertisers.

Go premium for $15.95  »

Tue, 04/24/2012 - 16:30

Hey Fabio, The trigger for the Baseline energy recovery requirement is the Proposed OA. Since the OA must be identical in both models (in the absence of demand controlled ventilation), when you apply the Proposed OA to the Baseline system if the OA% in the Baseline is over 70% of the Baseline cfm then the Baseline system must have energy recovery. So any Baseline system with an OA requirement below 3,500 cfm never needs energy recovery. OA is typically sized on primary airflow so in most cases the summer design day.

Thu, 04/26/2012 - 10:15

Hi Marcus! Don't you think that the worst condition of this 70% is the winter design day? The OA flow rate is constant during all the year but in this situation the total air is less than the summer condition (i have a VAV system). Anyway, i can calculate both the situations and only if both were less than 70% i could not consider the heat recovery. Do you agree? Thanks a lot. Have a good day!

Thu, 04/26/2012 - 13:33

Whichever one, summer or winter, gives you your primary airflow peak should be used. Over here it is usually the summer design day. Agreed, if the peak is less than 70% then no heat recovery in the baseline.

Add new comment