FAQs about EAp2 :

The project is built on a site with existing exterior lighting installed. How should this be accounted for?

Can mezzanines open to floors below be excluded from the energy model?

How do I provide a zip code for an international location?

For a project outside the U.S., how do I determine the climate zone?

For a project outside the U.S., how do I determine the Target Finder score?

Do hotel rooms need automatic light shut-off control?

How commonly are the 90.1 mandatory compliance forms submitted as part of EAp2/EAc1?

The Section 9 space-by-space method does not include residential space types. What should I use?

Can the Passive House Planning Package (PHPP) be used to energy model for LEED?

Is it acceptable to model a split-type AC with inverter technology compressor as a heat pump, like modeling VRF?

Can the Trace 700 'LEED Energy Performance Summary Report' by uploaded to LEED Online in lieu of the Section 1.4 tables spreadsheet?

A portion of our building envelope is historic. Can we exclude it from our model?

Which baseline HVAC system do I use if my building has no heating or air conditioning?

For an existing building, do I need to rotate the model?

Our project has a diesel backup generator. Should we include it in our energy model?

Our project has a large process load—75%. Despite our efforts to make an efficient HVAC design, the cost savings are minimal. What can we do to earn this prerequisite and be eligible for LEED certification? Is there any flexibility in how we model the p

Can SHGC be higher in the proposed than in the baseline model?

Our process load is higher than 25%. Do we have to justify that?

Do I need to justify the electrical and fuel rates I am using in my model?

Our local code references ASHRAE 90.1-2010. Should I use that for my documentation, or 90.1-2007?

View answers »

Forum discussion

NC-2009 EAp2:Minimum Energy Performance

Absorption chiller in baseline model

Dear all, Sorry in advance for this lengthy thread. In a current (European) project the certifying building will be supplied with district heat from a large city network. We use option 2 for modeling the district heat system according to the current DES Guidance. In summer the district heat will be used in an absorption chiller to cover the base cooling load. The absorption chiller will be installed inside the certifying building and designed and paid for by the building owner. In a CIR the GBCI reviewers noted that there must be a mechanical chiller in the baseline model instead of an absorption chiller: “Absorption chillers shall only be included in the Baseline Case model if the project team is using option 1 (building stand-alone mode).” We appealed that but the reviewers kept their view. They refer to two sections of the DES Guide: 1.) “Appendix E states that the Baseline Case should be compared against code-compliant on site equipment as described in Section 2.4” This seems to refer to the first numbered item starting “Model the district HEATING source…” option 2. This is about heating and not cooling, which we told the reviewers. 2.) “Table 4 (Page 12) indicates the energy sources that must be modeled for Option 2. For the baseline case, it indicates that an on-site cooling plant or packaged cooling must be modeled…” As far as we understand it this refers to district cooling only. Anyway there is not district cooling but only district heating. We are a bit lost on what to do. We still think that our approach of having absorption chillers in both baseline and proposed case is correct. Anyway, we don’t want to go through another appeal. Is there any way to escalate this issue to a higher level if we think the reviewers are wrong? Or does anybody have other hints or comments?

2

You rely on LEEDuser. Can we rely on you?

LEEDuser is supported by our premium members, not by advertisers.

Go premium for $15.95  »

Wed, 04/11/2012 - 14:11

You could submit a LEED Interpretation. This gets reviewed by the energy technical committee at USGBC.

Thu, 04/12/2012 - 05:27

We are thinking of submitting a separate LEED interpretation request on the issue with non-fossil fuel in district heat. In the case of the absorption chiller I am under the impression that the reviewers mix up requirements that are more or less clear.

Add new comment