I was brought on to a project to complete the ASHRAE 62.1 calculator after the project was denied LEED EBOM IEQp1. The project consists of two high rise office buildings. Tower "A" is conditioned via one air handler per floor with mixed use and occupancy. Tower "B" is conditioned via 4 large air handlers, each serving multiple floors with mixed use and occupancy. I understand after reading through leeduser.com that ventilation readings need only be taken at the air handler at minimum OSA. The owner/F&M staff are having a hard time tracking down the mechanical as-builts which would assist in determining mins and zoning. So, my questions is as follows: am I required to perform the ventilation calcs at the zone level (i.e. determine critical zones such as interior conference rooms)? I just want to be sure that politely demanding as-builts from the client to determine potentially critical zones and the associated mins is appropriate.