FAQs about EAp2 :

How do I account for computers with multiple monitors on Portfolio Manager?

How should I treat vacant space on Portfolio Manager?

Our building includes a large laboratory space. Can our project benchmark under the Labs21 program?

We have an international project and the space type is eligible for an Energy Star rating. Can we pursue Case 1 to demonstrate compliance given the recently released alternative compliance paths for international projects?

We have a number of buildings on a single campus that we would like to certify at the same time. Is it possible to benchmark the buildings at the campus level?

I have a mixed-use building and am wondering if it is possible to pursue the prerequisite through Case 1. How do we proceed?

We have a building that consists of two attached structures and it’s unclear if we have to consider it a single building or if it should be certified as two separate buildings and benchmarked accordingly. How should we proceed?

How long is an Energy Star label valid to use with a streamlined approach for Case 1?

Our building includes heavy process loads that significantly increase the overall energy use in the building. If we submeter these loads, can we exclude this energy use for benchmarking purposes?

We have installed submeters on our building but the utility bill includes energy use from several other buildings located on the same campus. How do we reconcile this during the LEED review process?

When is it possible to exclude up to 10% of the building from EAp2?

What do I do if the number of building occupants, operating hours, or vacant space changes during the performance period?

If you pursue the streamlined path for an Energy Star label, should the performance period for EAc6 match the 12-month time frame of the label?

View answers »

Forum discussion

EBOM-2009 EAp2:Minimum Energy Efficiency Performance

Data Center Might be Removed (cannot get a commitment) - Issues

One of 4 fairly identical buildings has a Data Center in 1/3 of it. It is not separately metered - problem for Energy Star, as the Data must be separately metered from the rest of that building - right? is there a way around this requirement? Reason being is the State of CA is considering removing the Data Center in a few months but won't commit either way -they just want the 4 buildings LEED EBOM by 2013. I cannot get an Energy Star score without a meter so do I tell the owner to put one in, in the hopes they keep the Data Center or not register at all until the State decides what to do? As the parking lot, open space, etc. are part of the common shared space, the rest of the buildings will have to wait until I put a meter in and wait another 12 months – right? At that time, I won't need it metered separately, so putting in a "data meter" will be a waste of time and money - right? FYI - without a meter and inputting projections, the ES score is a "100". If I register it as an office as it probably will be one, ES is a "1". Basically, the change in status will not be known and I don't want to waste money on a meter. Thanks! Thanks for your help!

1

You rely on LEEDuser. Can we rely on you?

LEEDuser is supported by our premium members, not by advertisers.

Go premium for $15.95  »

Wed, 04/11/2012 - 20:11

Hi Michelle, No way around the energy star requirement. You could opt for filling it in with estimates for now since you are not submitting for LEED or Energy Star Label immediately more for your on knowledge on feasibility. I am not following you question regarding parking lots? In Energy Star terms you need to benchmark this space if it is not currently sub metered. If it is sub metered then you do not have to include it in the building benchmark. For LEED you need to include this energy use regardless assuming the "owner" as control of it. Because you are receiving scores like that, there is something clearly wrong with the meter configuration you have set up. Hope this helps!

Add new comment

To post a comment, you need to register for a LEEDuser Basic membership (free) or login to your existing profile.