How is design storm interval determined? I looked into the LEED BD+C Reference Guide on page 97 in the example (last calculation) at the top of the page. From where do the 3 days / 72 hrs come?
I have an infiltration pond and it can hold the volume that is calculated, but it needs to be emptied before the next storm arrives. Is 3 days a default value or how can I determine the time to use between two storms? The actual project is in Warszawa, Poland.