A couple of quick reference questions: 1) I have some miscellaneous areas in my project (stairwells, electrical rooms, elevator equipment room) being served by split system AC units and 4-pipe fan coils. Am I required to model these areas in proposed and baseline? 2) My proposed design is a two story building served by a rooftop air handler with VAV's. Do I model it as two seperate VAV systems (one per floor) in baseline, proposed, or both? As always, thanks for your help.
You rely on LEEDuser. Can we rely on you?
LEEDuser is supported by our premium members, not by advertisers.
Add new comment
To post a comment, you need to register for a LEEDuser Basic membership (free) or login to your existing profile.