Forum discussion

NC-2009 EAc5:Measurement and Verification

Developing the plan post-construction

Is there any reason that we couldn't develop an M&V plan post-construction, assuming we have the necessary controls in place?

3

You rely on LEEDuser. Can we rely on you?

LEEDuser is supported by our premium members, not by advertisers.

Go premium for $15.95  »

Tue, 01/10/2012 - 21:20

You can develop a M&V Plan anytime prior to your construction submission for LEED. The controls relate only as your control system is set up to provide at least some of the data you will need to perform the M&V. At this point you are basically stuck with the currently installed data collection which was installed (unless you want to spend more money) so depending on the set up you may have to gather data the old-fashioned way through spot measurements and short-term trending meters.