ASHRAE 90.1 states that existing buildings shall be modeled as is before renovations. Currently the building has all of the window openings boarded up. I'm thinking that the best scenario would be to model the area of the window openings to be consistent and assign a u-value associated with plywood to the "window" and a SHGC of 0. Has anyone encountered this situation before, if so is this logic correct? Thanks.