Count me in with those frustrated with this credit language/ requirements. So I can be confident of our calcs, the local requirements call for vegetated open space to equal 25% of the total developed site area. LEED requires the project to exceed that local requirement by 25% (.25 x .25 = .3125). Therefore, if our site contains 10,000 sf, we achieve this credit by the site containing 3,125 sf of vegetated open space. Correct?
You rely on LEEDuser. Can we rely on you?
LEEDuser is supported by our premium members, not by advertisers.
Add new comment
To post a comment, you need to register for a LEEDuser Basic membership (free) or login to your existing profile.