Hi, I am working on a development located in the centre of a large site. If I measure the distance from the building entrance to the local transport node the credits will not be achieved, but if I take the site entrance as reference the requirements will be met. Although the guidance mentiones building entrance, I wonder if in large developments the site main entrance would be acceptable. If this was not the case, sites with large vegetated areas as encouraged by LEED (for example the open space credit) would be somehow penalized losing this 6 points. Thank you very much Alicia