FAQs about EAp2 :

For a project outside the U.S., how do I determine the Target Finder score?

Do hotel rooms need automatic light shut-off control?

How commonly are the 90.1 mandatory compliance forms submitted as part of EAp2/EAc1?

The Section 9 space-by-space method does not include residential space types. What should I use?

Can the Passive House Planning Package (PHPP) be used to energy model for LEED?

Is it acceptable to model a split-type AC with inverter technology compressor as a heat pump, like modeling VRF?

Can the Trace 700 'LEED Energy Performance Summary Report' by uploaded to LEED Online in lieu of the Section 1.4 tables spreadsheet?

A portion of our building envelope is historic. Can we exclude it from our model?

Which baseline HVAC system do I use if my building has no heating or air conditioning?

For an existing building, do I need to rotate the model?

Our project has a diesel backup generator. Should we include it in our energy model?

Our project has a large process load—75%. Despite our efforts to make an efficient HVAC design, the cost savings are minimal. What can we do to earn this prerequisite and be eligible for LEED certification? Is there any flexibility in how we model the p

Can SHGC be higher in the proposed than in the baseline model?

Our process load is higher than 25%. Do we have to justify that?

Do I need to justify the electrical and fuel rates I am using in my model?

Our local code references ASHRAE 90.1-2010. Should I use that for my documentation, or 90.1-2007?

Can I claim exterior lighting savings for canopy lighting even though a baseline model cannot include shading elements?

The project is built on a site with existing exterior lighting installed. How should this be accounted for?

Can mezzanines open to floors below be excluded from the energy model?

How do I provide a zip code for an international location?

View answers »

Forum discussion

CS-2009 EAp2:Minimum Energy Performance

diesel generator on-site

Hi everyone, we are working on a project that produces its electricity on-site via diesel generators. The produced energy covers all energy consumption (heating is electric). After 3-5 years the building will be connected to the public power supply, the diesel generators serve as emergeny power aggregates. Since this is first time we are facing this I have some questions: 1. Should our LEED certification include the generators or are they negligible? If they should be included: 2. Whats the correct way to determine energy rates? Our oppinion : Proposed: Diesel Consumption * Diesel Prize * Efficiency of Generators Baseline: Typical Prize for Electricity * Consumption 3. The heating system is electric, but the fuel is originally diesel, so should we pick the according BL system for electric? 4. Are there any mandatory provisions for the generators? Thank you for any hints!

4

You rely on LEEDuser. Can we rely on you?

LEEDuser is supported by our premium members, not by advertisers.

Go premium for $15.95  »

Fri, 10/14/2011 - 21:55

The project must include all energy consumed and associated with the project. The energy costs must be identical in both models see G2.4. I would determine the electric cost from the generators and use that in both models. I would look to the District Energy Systems guidance on USGBC's web site for guidance on the way to model this and the appropriate BL system. I don't think generators are covered by 90.1.

Add new comment

To post a comment, you need to register for a LEEDuser Basic membership (free) or login to your existing profile.