NC-2009 MRp1:Storage and Collection of Recyclables

Which Waste Streams Should Be Included?

Hi All. Is this credit specifically for office waste or all waste streams? I’m working on a large industrial factory building, and whilst the operator has a policy of recycling materials from the manufacturing process this is a very different process to the occupant-led recycling facilities and plan. Would in internal layout drawing need to show the recycling areas on the factory floor? Many thanks. Kit

3

You rely on LEEDuser. Can we rely on you?

LEEDuser is supported by our premium members, not by advertisers.

Go premium for $15.95  »

Fri, 09/09/2011 - 17:42

The prerequisite requires a description and drawing that shows the "dedicated recycling storage areas" that are used to collect "paper; corrugated cardboard; glass; plastics; metals"; this may be quite different than the manufacturing process that reclaims pre-consumer material for reuse/recycling.

Add new comment

To post a comment, you need to register for a LEEDuser Basic membership (free) or login to your existing profile.