I have two buidings on the same site/project boundry.
Do I model the two buildings as one building? If I did two seperate models I am not sure how I would show this on the LEED Credit Template.
They are both considered major renovations so the % inprovement / point scale is the same for both buildings.
David Mirabile
LEED AP, BD+C68 thumbs up
July 29, 2011 - 2:40 pm
Yes, model them as one building. I recently went through the same scenario. Be sure to read the LEED for Multiple Buildings and On-Campus Building Projects to ensure you are follwing the corret procedures in not only this credit but others.
Marcus Sheffer
LEED Fellow7group / Energy Opportunities
LEEDuser Expert
5906 thumbs up
September 19, 2011 - 4:40 pm
Also check the MPRs regarding multiple buildings within a single submission.