Forum discussion

NC-2009 EAc1:Optimize Energy Performance

Building Envelope Requirements for Continuous Insulation

We have a project that has structural masonry walls, and interior steel studs. Appendix G requires 7.5 c.i. for our walls, so I have two questions: 1. Can the continuous insulation be located on the interior wall and can it be just spray foam and not continuous board insulation? 2. What is the rule for insulating between floors in this case? Do we have to spray foam in between the steel and CMU between floors?

4

You rely on LEEDuser. Can we rely on you?

LEEDuser is supported by our premium members, not by advertisers.

Go premium for $15.95  »

Tue, 07/19/2011 - 19:27

I don't recal Appendix G specificly requiring a c.i. It does indicate that Steel-framed above grade walls from section 5 are to be used for the baseline model, which allows either a maximum assebly U-value or minimum insulation R-value. I wouldn't worry so much about the c.i. as long as the model meets the assembly requirements.

Add new comment

To post a comment, you need to register for a LEEDuser Basic membership (free) or login to your existing profile.