FAQs about MRc1 :

We purchased hundreds of ongoing consumables items during our performance period. Do we have to enter each discrete purchase into the LEED Online credit form?

Our organization has a centralized purchasing program that buys products for several buildings, including the one pursuing LEED-EBOM certification. It’s difficult to track which ongoing consumable goods purchases are used in the EBOM building versus the

Purchasing for our organization takes place in the EBOM project building, but not all ongoing consumable goods that are purchased end up being used there. Should we include all of the purchases in MRc1?

We have multiple tenants in our building, some of which are nonresponsive to requests for purchasing records. Can we exclude their purchases?

Does a signed letter from a product manufacturer that states the sustainability criteria met by a particular product count as acceptable LEED documentation?

Do manufacturer claims about the average recycled content, etc. in all its products count as acceptable LEED documentation? For example, a toner cartridge website says that the average post-consumer recycled content is 90% across all its toner products.

Lots of products we purchase seem like they could be tracked in two different purchasing credits. For example, toilet tissue seem like an ongoing consumable since it’s replaced frequently at a low cost per unit (MRc1), but it’s also used for our green

The credit language says we need to track paper (printing or copy paper, notebooks, notepads, envelopes), toner cartridges, binders, batteries and desk accessories. Is that everything we have to track for this credit?

View answers »

Forum discussion

EBOM-2009 MRc1:Sustainable Purchasing—Ongoing Consumables

Dormitory Tracking

I am working on a university dormitory with 500 students living there. It would be almost impossible to track all of their purchases. However there are public spaces, bathrooms, offices and a store that is under management control and we would like to pursue this credit for those spaces. Is it acceptable to exclude the students and implement sustainable purchasing for rest of the building to achieve this credit?

5

You rely on LEEDuser. Can we rely on you?

LEEDuser is supported by our premium members, not by advertisers.

Go premium for $15.95  »

Tue, 05/03/2011 - 03:22

LEED CI, when applied in office situations does not require tracking user purchases ( or at least we haven't been dinged for it). EB and CI are focused on building/space operations not the actions of individuals. Must an auto plant track the steel in all the vehicles being made? It's all pass-thru, not fundamental to building operations. Must you track thehe recycled fabric in the children's clothing in a school project? I suggest the following questions to ask: 1. Is the material in question fundamental to building operations? 2. Is the material purchased by the building operator or for the building operators? e.g. vendor purchased paper towels should be counted e.g. A factory manufactures fluorescent lamp fixtures, and uses similar fixtures to light the factory floor. Here I think one tracks the product used to light the factory floor, not the product produced.

Add new comment

To post a comment, you need to register for a LEEDuser Basic membership (free) or login to your existing profile.