The top floor of our 4 story building was fit out and rented toward the end of our performance period (it was shell space prior to this). Some credits that required surveys, such as SSc4 and IEQc2.1, were completed before the tenants moved into the building. The FTE that we've been using is based on 3 floors of occupancy, not 4 floors. Is the original FTE still legitimate even though the increased occupancy will affect energy and water usage credits?