Our project is the renovation of an existing building from 1955. No Phase II ESA was done, but we hired an environmental consultant to do an asbestos and lead paint survey. The report we got back states that there's asbestos in the flooring throughout, in textured ceilings, window seals, and lead paint on fire doors, etc. Is the report from the consultant stating this enough documentation for Option 2, Upload SSc3-2?