Our client is occupying the 8th floor of a G+8 building. The central plant is a combination of Air cooled and water cooled chillers. The conditioned area of the project area alone is 45,000 sqft and segment area is 322,000 sqft. I simulated using the project area-segment area method. I used the existing conditions for segment area in both base case and proposed case. I modeled the project area as per ASHRAE 90.1 2007. Now the problem is with the savings calculation. As per LEED, the formula is (Base case-Proposed Case)/(Base case*(project area/segment area)). Since the project is occupying only 1 floor, the project area/ segment area ratio comes up to 0.139 and because of this the savings goes higher than 100%. In other words, we will be multiplying the savings by 7 times if we calculate the savings by the usual formula, (Base case- Proposed case)/base case. Kindly guide how to proceed. Thank you
You rely on LEEDuser. Can we rely on you?
LEEDuser is supported by our premium members, not by advertisers.
Add new comment
To post a comment, you need to register for a LEEDuser Basic membership (free) or login to your existing profile.