IEQp1 Upload # 6 - "Provide the regulatory approval letter or document indicating the engineered system has been approved by the authority having jurisdiction."
Will approved building department permit application satisfy this requirement?
Forum discussion
CI-2009 IEQp1: Minimum IAQ Performance
IEQp1 Upload # 6 - "Provide the regulatory approval letter or document indicating the engineered system has been approved by the authority having jurisdiction."
Will approved building department permit application satisfy this requirement?
LEEDuser is supported by our premium members, not by advertisers.
Go premium forTo post a comment, you need to register for a LEEDuser Basic membership (free) or login to your existing profile.
Is outdoor air quality testing required in a space using natural ventilation?
What options are available to projects outside the US to meet this prerequisite?
Can LEED 2009 projects elect to follow ASHRAE 62.1-2010 for this prerequisite?
Which units should be included in the calculations for this prerequisite?
Roger Chang
Principal, Energy and Engineering LeaderDLR Group | Westlake Reed Leskosky
LEEDuser Expert
398 thumbs up
August 30, 2010 - 8:28 am
Malik, upload #6 is meant to apply more to naturally ventilated buildings where computational fluid dynamics of multi-nodal airflow modeling is used to validate a design that would otherwise not meet prescriptive mechanical ventilation requirements. A building permit would be acceptable, but I would make sure someone actually reviewed the ventilation data submitted. Depending on jurisdiction, ventilation data is only given a cursory review.
Malik Rehman
23 thumbs up
September 1, 2010 - 5:14 pm
Thank you for your reply.