Another related question:
Is the material cost = the contract value of the material? Typically the contract value of the material is an estimated value. Actual cost could be more or less.
Thanks.
You rely on LEEDuser. Can we rely on you?
LEEDuser is supported by our premium members, not by advertisers.
Hi Travis,
Contractor fees are typically considered part of the "hard costs" of construction (as opposed to design fees and permitting costs, which are soft costs), so they should be included. That is also consistent with the Ref Guide guidance on your 2nd question--which is to include transportation/delivery fees in the cost of materials.
Regarding Travis' question on actual cost vs. contract value, the preferred approach would be to use actual costs, but if that's hard to get and you have contract values readily available that might be acceptable. Could be worth asking in a CIR or trying it that way in an initial application, as long as you're prepared to go back and dig up the actual costs if they require that.
Here's the problem I have with this: "Cost to the owner" AKA "Contract Value" can be way more than just hard hosts. Many of our subcontractors have a design-assist role (i.e. curtain wall subcontractor/installer), and I don't think it's fair to include all that money for hours and hours of engineering and drafting to take your 45% from. Temporary materials? Yes. Shop Drawings? No. Imagine a Venn diagram with material cost within installed cost, and installed cost within contract value. I think it's perfectly fair to take 45% from whatever you can prove (via a SOV or requisition) is an accurate "installed cost", even if that "installed cost" is only 70% of the contract value. I can't say there is consensus on this, this is my interpretation based on the intent of the credit. I can't say all other agree with me on this but you should...