These 2009 study results show a median normalized cost of $0.30/ft2 to deliver commissioning for existing buildings. The median whole-building energy savings was 16%, with payback time of 1.1 years. In terms of other cost-benefit indicators, median benefit-cost ratios of 4.5 and cash-on-cash returns of 91% were attained for existing buildings.