Besides energy modeling, you may need to use the exceptional calculation methodology (ECM) when any of the following situations occur: 

The energy software cannot carry out calculations for a specific system like natural ventilation or unusual HVAC equipment.
Process loads are different in baseline and design cases and can influence total energy cost savings.
The proposed design can’t demonstrate savings with the modeling protocol and needs additional calculations. 

Credits
Project phase
Credit tip type