If you are earning two points at 14%, the first round of the model should aim for a minimum 16%–17% cost savings. There may be reduction with changing design or modeling mechanism. Also remember the energy cost savings typically involve the building systems and assume 25% process loads fixed between design and baseline. 

Credits
Project phase
Credit tip type