Strategies for space planning may include:
Stack common-use areas so that all janitors’ closets are located in the same place on each floor, then run a single exhaust duct vertically through the building for each exhaust fan to tie into.
Add height to the deck-to-deck elevation to provide extra space above finished ceilings for ductwork.
Locate rooms identified as containing hazardous material adjacent to outside walls to reduce the need for more ductwork.
Credits
Project phase
Credit tip type