Check local building codes to determine requirements. The project must either meet ASHRAE 62.1-2004, or local codes if they are more stringent. Since ASHRAE 62.1-2004 is often more stringent than local codes, be sure to review and be familiar with its requirements.
Credits:
Project phase:
Credit tip type: