As stated in the LEED Reference Guide, the following items must be monitored:
- lighting systems and controls
- constant and variable motor loads
- variable-frequency-drive operation
- chiller efficiency at variable loads
- cooling load
- air and water economizer and heat recovery cycles
- air distribution static pressures and ventilation air volumes
- boiler efficiencies
- building-related process energy systems and equipment
- indoor water risers and outdoor irrigation system.
Credits:
Project phase:
Credit tip type: