The owner’s goals and IPMVP guidelines should drive the M&V plan, which should specify the systems to be submetered, those to be spot-metered, and how this will be accomplished. The plan also explains the infrastructure design, locations of meters and

The owner’s goals and IPMVP guidelines should drive the M&V plan, which should specify the systems to be submetered, those to be spot-metered, and how this will be accomplished. The plan also explains the infrastructure design, locations of meters and meter specifications, the one-line electrical schematics identifying end-use circuits, and the details of tenant submetering. However, tenant submetering is not actually required for this credit—only for EAc5.2: Measurement and Verification—Tenant Submetering