The M&V provider develops the M&V plan. If possible, involve the facility’s operational staff in writing the plan, which must define the following:baseline energy use;post-construction energy use;adjustments that should be made to the baseline ene

The M&V provider develops the M&V plan. If possible, involve the facility’s operational staff in writing the plan, which must define the following:

  • M&V system design;
  • meter locations and specifications;
  • one-line electrical schematics identifying end-use circuits;
  • and guidelines for tenant submetering.