The M&V provider develops the M&V plan. If possible, involve the facility’s operational staff in writing the plan, which must define the following:
- M&V system design;
- meter locations and specifications;
- one-line electrical schematics identifying end-use circuits;
- and guidelines for tenant submetering.
Credits:
Project phase:
Credit tip type: