Review the following sections of the Core Performance Guide (CPG) and credit requirements:Section 1. 4 – Check that the part-load calculations have been completed and that compliance with ASHRAE-55 has been confirmed.Section 2.9 – Ensure that your project

Review the following sections of the Core Performance Guide (CPG) and credit requirements:

  • Section 1. 4 – Check that the part-load calculations have been completed and that compliance with ASHRAE-55 has been confirmed.
  • Section 2.9 – Ensure that your project’s mechanical design and equipment comply with the CPG efficiency requirements.
  • Section 3.10 – Verify that the highest efficiency fans and pumps have been identified. Variable frequency drive pumps and variable air volume (VAV) distribution systems can be used to address fluctuating demand. Sensors and controls to measure air volumes and reduce energy waste during low occupancy should be installed. 
  • Appropriate Zoning and Controls – Further develop designs for the separate zones and controls to be installed. Confirm that these meet the requirements. 