Continue to verify that the prescriptive requirements of ASHRAE 90.1-2007, Sections 5–10, are being met throughout changes in the design development phase.  

Continue to verify that the prescriptive requirements of ASHRAE 90.1-2007, Sections 5–10, are being met throughout changes in the design development phase.  