If the building has reflective roof or non-roof surfaces contributing to Option 2, Paths 4 and 5, the reflectance of those materials should be maintained over time with proper cleaning. Although maintaining these materials may be out of your scope, consider recommending it to building operations staff.  

Credits
Project phase
Credit tip type