Refer to LEED-NC WEc2 for detailed requirements and documentation guidance. Note, however, that while LEED-NC requires 50% of wastewater be treated onsite, this path for LEED-CI requires 100% of water be treated onsite.

Credits
Project phase
Credit tip type