Refer to LEED-NC WEc2 for detailed requirements and documentation guidance. Note, however, that while LEED-NC requires 50% of wastewater be treated onsite, this path for LEED-CI requires 100% of water be treated onsite.
Credits:
Project phase:
Credit tip type: