There are three compliance paths available to meet the requirements of this path. Tenants can locate in a building with one of the following attributes.
Option 1: 75% of the roof is covered with reflective materials with an SRI value of 29 or greater for pitched roofs or an SRI value of 78 or greater for low-sloped roofs.
Option 2: 50% of the roof is vegetated.
Option 3: A combination of the first two options.
Credits
Project phase
Credit tip type