Refer to NC SSc7.1 for detailed requirements and documentation guidance. Note, however, that the requirement for this option through LEED-CI is to meet the credit requirements for 30% of the non-building-area instead of the 50% required for NC projects.
Credits
Project phase
Credit tip type