The simulation and prescriptive paths—paths 1 and 2 for Option 1: Daylight—are not very practical for project teams to follow unless the daylight analysis was already conducted as part of the initial design and construction of the building and the records of that analysis are readily available.
Credits
Project phase
Credit tip type