Consider both Option 1 and Option 2 for your project building. Option 1 involves a single water meter for the whole building and grounds, and is easier than Option 2, which requires metering at least one subsystem such as irrigation or the cooling tower.

Consider both Option 1 and Option 2 for your project building. Option 1 involves a single water meter for the whole building and grounds, and is easier than Option 2, which requires metering at least one subsystem such as irrigation or the cooling tower. See information on both options below.