Log in

Specify efficient water fixtures in construction documents. Be sure to include specific flow and flush rates (gpm or gpf) for each type of fixture.

Specify efficient water fixtures in construction documents. Be sure to include specific flow and flush rates (gpm or gpf) for each type of fixture.

Project phase: 
Credit tip type: