Specify efficient water fixtures in construction documents. Be sure to include specific flow and flush rates (gpm or gpf) for each type of fixture.
Credits:
Project phase:
Credit tip type:
Specify efficient water fixtures in construction documents. Be sure to include specific flow and flush rates (gpm or gpf) for each type of fixture.