Tenants should determine whether efficient water fixtures are already provided in the base building, or if water fixture upgrades can be added to the scope of the project. Ensure that the project will be able to achieve the minimum 20% threshold required by the prerequisite and at least 30% for credit points.

Credits
Project phase
Credit tip type