Restoring or protecting portions of a site is a relatively low-cost option to pursue, and compliance with these requirements contributes to the achievement of other LEED credits such as:

SSc5.2: Site Development—Open Space,

SSc6.1: Stormwater Design—Quantity Control,

SSc6.2: Stormwater Design—Quality Control,
and WEc1: Water-Efficient Landscaping.

Credits
Project phase
Credit tip type