Ask the modeling consultant to develop an annual energy-use breakdown—in order to pick the “fattest” targets for energy reduction. A typical energy-use breakdown required for LEED submission and ASHRAE protocol includes:
lighting;
space heating;
space cooling;
domestic hot water;
additional installed heat recovery, refrigeration, or heat-rejection systems;
ventilation fans and auxiliary pumps;
and equipment and plug loads.
Credits
Project phase
Credit tip type