How do you decide whether to use the actual or the default materials budget as your baseline? The lower you can get the baseline, the easier it is to purchase enough reused material to reach the credit threshold. For example, if a project is renovating an existing building that will have low material costs and high labor costs, it may be better to use the actual rather than the default approach, because the 45% default may bring the baseline too high.

Credits
Project phase
Credit tip type