Drawing up the default budget is less time-consuming because the contractor does not have to break out materials versus labor costs, allowing the project to focus on tracking only the materials that contribute to LEED credits. However, this option may put the project at a disadvantage if the materials cost is actually less than 45% of the total cost, in which case you would get credit for less than the full cost value of your materials.