How do you decide whether to use the actual material cost or the default budget as your baseline? Try estimating how your actual material costs compare to the 45% default. The lower you can get the baseline, the easier it is to purchase enough recycled material to reach the credit threshold. For example, a project that is renovating an existing building may have low material and high labor costs, so it might be better to use the actual budget instead of the default approach.

Credits
Project phase
Credit tip type